I was reading this paper regarding the yield curve construction and was programming the Raw Interpolation algorithm (page 7 equation 6) however I was wondering how to use the formula when the desired term is out of the originals. So the interpolation formula is: $r(t) = \frac{t-t_i}{t_{i+1}-t_i}*\frac{t_{i+1}}{t}*r(t_{i+1})+\frac{t_{i+1}-t}{t_{i+1}-t_i}*\frac{t_i}{t}r(t_i)$
where $t$ is the desired term, $t_i$ is the previous known term to the one desired and $t_{i+1}$ is the next one. To be clear, my question is how to use this interpolation when $t<t_i$ or $t>t_{i+1}$. At first I thought to set $t_i$ or $t_{i+1}$ (depending on $t$) to 0 but then it doesn't make sense if the original terms goes from 100 to 110 for example.